316 King Street
This 12 level project began pouring concrete in February 2007 and was completed for occupancy in September of 2007.
9 levels of student accommodation topped by a unique custom Penthiuse boasting 20 foot ceilings and a custom movie theatre.
Underground parking, 2 elevators, rooftop mechanical and elevator machine rooms.
The first high rise building built in the City of Waterloo's 2005 Core Intensification Strategic plan, this project boasts one of the most environmentally friendly thermo-ratings every built. Insulated Concrete Froms, a centralized owner-managed energy control system allows for maximum efficiency, with live access and complete control of all heating and air conditioning units.
Built with the potential to add 81 additional rooms.